Beckton Dickson

Curitiba - PR

Pharmaceutical

Project Description

Structural expansion and reinforcement of the BD manufacturing plant, for the installation of a new production line for vacuum blood drawing devices. Expansion of the ground storage area, construction of an additional storage floor, with capacity for 1,7 tons/m², and a cooled area.

Challenges

Reinforce the foundations and structure for the construction of the first floor of an existing single storey plant, which will remain in operation throughout the construction work.

Solution

Matec differentiating factor

Matec Engenharia proposed a technical solution of foundation strengthening of the existing building, which required less extensive soil excavations and provided time savings. The proposal for the metallic structure was also benefited, preventing demolitions and propping of the existing building.

Images

 
Mostrar Mais